Hours:
8.00
Jan 23, 2022
Started work on the firewall forward components, plumbing and wiring. Carbs and fuel lines installed, electronics installed. Started on the cooling plumbing, but still need to rotate on of the water pump housing outlets. I'll be using the GRT ESI for an engine monitor...as soon as I get that, wiring can start.



RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-7/9
RV-8
Bearhawk
RV-14
STOL CH 750
STOL CH 750
182P, Q, R, R182, TR182
35-B33
Bearhawk
RV-14
RV-14
CH 750 Cruzer
RV-7/9
RV-6
RV-6
Bearhawk
Model 4
Model 4
Ultralight TL 2000 Carbon
RV-4
RV-4